In recent years, El-Mor Renewable Energy, in cooperation with its partners, has constructed and connected many different sites to the electricity grid.

The construction process included:

Preliminary and detailed planning, including: PV system, control and energy systems, civil engineering, and security.

Execution of the installation includes:

  • All civil engineering works (converter stations, roads, drainage, fencing, and electrical and security infrastructure)
  • All energy and electricity works – AC, DC, MV – including purchase of equipment, installation, and test running
  • Communications, monitoring, and power control systems

Details of selected projects:

Ultra-high voltage sites:

  • Mashabei Sadeh – 60 MWp
  • Zemorot – 50 MWp
  • Ketora – 40 MWp

High voltage sites:

  • Dorot, Talmei Yaffe, Kidmat Tzvi – 31 MWp
  • Mishmar Hanegev – 8 MWp
  • Sdeh Boker – 5 MWp
  • Of Oz (Ashalim, Telamim, Eitan, Sdeh Moshe) – 13 MWp
  • Bitcha – 7 MWp
  • Gesher Haziv, Beit Ha’emek, Kfar Ruppin – 12 MWp
  • Brosh, Shibolim – 20 MWp
  • Beit Hashita – 6.8 MWp
  • Kadarim (under construction) – 6.8 MWp

Low voltage sites

  • Tirat Tzvi project – system floating on dam – 0.3MWp
  • Kfar Yehoshua – floating system – 1.65MWp
  • Merom Golan – floating system – 0.92MWp

Rooftop sites

  • Shufersal Ramot Sapir – 134 KW
  • Shufersal Carmiel – 194 KW
  • Kingstore Akko – 215 KW
  • Shufersal Emeq Hefer – 282 KW