Owners: Nofar

Size: 1.6 MWp

Location: Kfar Yehoshua

Construction: 2019

The construction process included:

  • Construction of a floating system on the surface of reclaimed-water reservoirs (Total: three reservoirs)
  • Execution included civil engineering works – structures, anchoring, cabling infrastructures, etc.
  • Execution included all energy and electrical works – AC, DC
Back to Selected Projects