In recent years, El-Mor Renewable Energy, in cooperation with its partners, has constructed and connected many different sites to the electricity grid.
The construction process included:
Preliminary and detailed planning, including: PV system, control and energy systems, civil engineering, and security.
Execution of the installation includes:
- All civil engineering works (converter stations, roads, drainage, fencing, and electrical and security infrastructure)
- All energy and electricity works – AC, DC, MV – including purchase of equipment, installation, and test running
- Communications, monitoring, and power control systems
Details of selected projects:
Ultra-high voltage sites:
- Mashabei Sadeh – 60 MWp
- Zemorot – 50 MWp
- Ketora – 40 MWp
High voltage sites:
- Dorot, Talmei Yaffe, Kidmat Tzvi – 31 MWp
- Mishmar Hanegev – 8 MWp
- Sdeh Boker – 5 MWp
- Of Oz (Ashalim, Telamim, Eitan, Sdeh Moshe) – 13 MWp
- Bitcha – 7 MWp
- Gesher Haziv, Beit Ha’emek, Kfar Ruppin – 12 MWp
- Brosh, Shibolim – 20 MWp
- Beit Hashita – 6.8 MWp
- Kadarim (under construction) – 6.8 MWp
Low voltage sites
- Tirat Tzvi project – system floating on dam – 0.3MWp
- Kfar Yehoshua – floating system – 1.65MWp
- Merom Golan – floating system – 0.92MWp
Rooftop sites
- Shufersal Ramot Sapir – 134 KW
- Shufersal Carmiel – 194 KW
- Kingstore Akko – 215 KW
- Shufersal Emeq Hefer – 282 KW