Owners: EDF – Arava Power

Size: 40 MWp

Location: Ketora

Construction: 2014-2015

Characteristics:

The site is located on the Jordanian border and required constant coordination with the responsible authorities.

In addition, the site is located in the Arava, an isolated area which increases the difficulty of execution.

Back to Selected Projects