
Owners: DORAL
Size: 4.3 MWp
Location: Gesher Haziv
Construction: 2018
Characteristics:
- Structural planning adapted to 2 km proximity to the sea
- Converting a no-man’s-land into a productive, electricity-generating site
- Planning of drainage coordinated with various drainage authorities, and consideration of several factors: Animals in the area; agricultural land, etc.