Owners: Enlight – Mishkei Energy Partnership

Size: 13.8 MWp

Location: Dorot

Construction: 2018

Characteristics:

The site is actually made up of two sub-sites.

The site was constructed simultaneously with a military operation, which gave rise to numerous logistical challenges during construction.

The system includes a dry robotic panel cleaning system.